How do quotation, BOM and drawing stay on the same revision?
Specify one accepted configuration reference across quotation, material list and drawing outputs, with a practical three-document reconciliation test.
Table of contents
A quotation, BOM and drawing should identify the configuration revision they describe. Generating all three files is not sufficient if each uses different saved values or rules. Before buying, request a reconciliation exercise that follows one product change through every required output.
Define the record that triggers each output
An enquiry may generate a summary before technical review. A quotation may be issued after commercial approval. A factory drawing may require additional verified measurements. Identify these stages and decide which configuration becomes authoritative for each document.
Use explicit references rather than a shared customer name. One customer can have several projects, and one project can have multiple revisions. Similar filenames do not establish that the files belong together.
| Output | Reference to verify |
|---|---|
| Customer quotation | Selected scope, price basis and issued revision |
| Material list | Component identities, quantities and source revision |
| Drawing | Applicable dimensions, arrangement and approved revision |
| Integration record | The same accepted configuration reference |
Change a measurement that affects materials
Prepare a frame at one size and generate the agreed outputs. Increase the width within the valid range, then regenerate or revise them under the approved process. Compare the quotation, material quantities and drawing dimensions.
Inspect the old documents too. They should remain identifiable as earlier outputs rather than being silently replaced with new content behind the same supposedly issued reference.
Test timing and failed generation
Ask what happens if the quotation is ready but drawing generation fails. The project should retain a clear status and a next action. A partially generated document set should not look like a complete factory release.
Likewise, confirm how queued outputs handle later edits. A drawing requested from revision A should not silently read revision B when the background task finally runs. The supplier should explain how the request identifies its intended input.
Specify the connected record in Configurix
Configurix can define custom quotation, BOM and factory workflows around your approved product data. Provide one current quotation, material list and drawing for the same product. Use them to establish required fields and cross-checks, then test a meaningful amendment.
Must all documents be generated at the same moment?
No. They may belong to different workflow stages. Each still needs a clear source revision and approval status so the receiving team understands what it can use.
Is a shared project number enough?
Not when the project has changed. Include a configuration or document revision that distinguishes the accepted values used for each output.
Book a private Configurix demo
Bring your product range, price list and a representative quote. We can define the configuration and sales workflow around your business.
Book a private Configurix demo →Related articles

How much engineering data should a public configurator expose?
Review public configurator assets, browser data and private calculations before sharing confidential geometry or component information online.

Can one quotation contain several configurable products?
Plan multi-product configurator quotations with separate rules, shared project information, installation scope and traceable commercial totals.

What happens to saved quotations when prices change?
Define configurator price updates without losing earlier quotations, including effective dates, repricing decisions and customer acceptance records.

What happens when site measurements change an online design?
Define how verified site measurements update a configurator project, quotation, technical review and factory handoff without losing the original request.
